We have followed several engine installations, with a focus on thermal recoveries in the paper production cycle.
Among other applications, we have worked with
engines of various sizes from 1.5 MW Deutz, for steam production only, 1.487 MW Jenbacher, with HT and LT steam production and recovery, 2 MWw and 4.3 MW MW MWM, with HT and LT steam production and recovery, 1.54 and 3.2 Caterpillar with HT and LT steam production and recovery..
In particular,
we followed the part of electrical connection to the plant grid, parallel or island operation, and interruptibility.
We also took care of the steam mplant integration of the second generator, with PED directive application and INAIL paperwork.
In addition, we have
optimized thermal recoveries of HT and LT water carriers, with trigeneration applications for 7 - 12°C chilled water production.